Page 27 - weller
P. 27
TRACEability Workflow
Traceable Process Control.
The following workflow diagram depicts a serial number with bar
code integrated PCB production using the Weller WX station.
The workflow includes interaction by the operator and the dialog of
the Traceability System with the WX station.
TRACEABILITY SYSTEM
ERP Control
MES System
CUSTOMER 3b 4a 6a
IN 1 2 XML OUT
Unit Data
WELLER
3b 4a 6a Traceability interface
RS 232, USB
EQUIPMENT
1. Begin processing of product:
Scan PCB or product to be soldered. 4.a Begin processing of product:
2. Transmission of data to the Traceability System. Scan PCB or product to be soldered.
3.a Prepare WX station: The Traceability System 4.b Transmission of data to the Traceability System.
delivers process parameter selection data. 5. Prepare WX station: The Traceability System
6.a
3.b Parameterization of the WX station delivers process parameter selection data.
Process parameter lockout: 6.b Parameterization of the WX station
Auto tool temperature set and lockout. Process parameter lockout:
Auto tool temperature set and lockout.
HIGH PERFORMANCE
IN PERFECTION How does traceability work?
See the video on
www.youtube.com/wellersoldering
27